top of page
Fast Build Power Station. Wide shot of power station.

Fast-Build Power Stations

The Arunpower transportable fast-build power station is a brand new concept in cost-effective power generation.

We offer our plant for lease or purchase.

Our plant, built around generating sets made by MAN of Germany, runs on Heavy fuel available. Using our containerised modular system, we can install our capacity quickly to satisfy your interim or long term power requirements.

Save millions on power generation.png

FUEL

AFFORDABLE

Fuel costs account for the largest component of power prices. Most emergency power plants burn expensive diesel fuel, also known as Light Fuel Oil (LFO).


Our plant runs on the more affordable alternative: HFO, also known as No.6 Oil, Bunker Fuel or Low Pour Fuel Oil. HFO usually trades at around half the price of LFO, and is generally taxed less.

EQUIPMENT

Our standardised concept makes small and medium-sized HFO plants affordable, regardless of whether you are looking to lease or buy.

Man working on power station in Hi-Ves vest.
Location shot of grey pipline within Power Station.

CONTRACTS

We will tailor the commercial arrangement around your needs. This can include conventional plant lease, lease leading to a purchase, or turnkey EPC.

CAPACITY

FLEXIBLE

You can increase or decrease your plant’s capacity at any time by adding or removing 12 MW modules.

LOCATION

Our modular containerised plant is transportable and fully reusable. At the end of service in one location the plant can be dismantled and removed, or larger plants can be split into smaller ones.

ENGINEERING

Our unique solution uses proven HFO technology and delivers it in a transportable system. Our equipment is sourced from leading manufacturers and meets all relevant international standards.

SIMPLE

Plant installation is fast. All we need is a flat compacted site with simple concrete foundations. The plant arrives in standard containers and is assembled and commissioned in as little as 12 weeks.

INSTALLATION

OPERATION

Plant installation is fast. All we need is a flat compacted site with simple concrete foundations. The plant arrives in standard containers and is assembled and commissioned in as little as 12 weeks.

Detail shot of power station being built.
Graph showing the Three Steps to Fast-Build Power generation.

SHORT LEAD TIMES

We can deliver capacity quickly because we have
all the necessary equipment in stock.

FULL SERVICE

Our team of specialist technical personnel will install and commission the plant. If required, we will also operate and maintain the plant, providing you with a complete power solution.

ENVIRONMENT, HEALTH & SAFETY

Our equipment is designed to UK and EU standards. Our operations comply with the highest local and World Bank-IFC environmental guidelines and international best practices for health and safety.

UTILITY APPLICATIONS

• Increase installed capacity
• Replace expensive diesel generators
• Reduce dependence on

imported power
• Provide interim power while the next permanent power station is built

INDUSTRIAL APPLICATIONS


• Supply remote locations off

of the grid.
• Substitute unreliable grid supply
• Replace expensive diesel generators

bottom of page